The existing concrete flat roof construction over classrooms and offices is failing. Water ingress is evident in several locations and props are in use where the structure has begun to collapse. The project includes the following; – Provision of replacement temporary classrooms, offices, WC’s and storage areas required for continued, uninterrupted school life. This work […]
This build was a replacement for the existing portable cabins used for both a community youth club and a day nursery. The new building was designed in a horseshoe shape to provide a safe exterior courtyard for the day nursery along with kitchen, classrooms and WCs all down one side of the building and central […]
To replace existing portacabin classrooms with a new building, providing three large classrooms, a toilet block and a link corridor to the main school. The finished classrooms were fully equipped with storage units, bookshelves and craft areas, including sinks. The construction was of a single storey building built over traditional foundations with ground bearing slab […]
P.A. Hollingworth was contracted to undertake the installation of a ‘secure line’ boundary to the school grounds. This included the installation of new security fencing, vehicular and pedestrian gates, access control systems and a site-wide CCTV system alongside associated sundry works. External Grounds – We formed the new secure site boundary using 2.0m high P100 […]
P A Hollingworth & Co Ltd were contracted to safely expand a Sure Start Children’s Centre in Thanet without closure, making maximum use of the outside courtyard and adding both a kitchen and DDA compliant WC. This was a 66m² courtyard, surrounded on 3 sides by existing single face brickwork walls to the existing building. As […]
P A Hollingworth & Co Ltd were contracted to undertake external & internal uplift and refurbishment of both Houses, including replacement of all roofs, restoration of stonework, windows and brickwork. Redecoration of exterior and partial refurbishment and decoration of various internal rooms. Extensive access scaffold has been required on this project and has been provided […]
P A Hollingworth & Co Ltd were contracted to provide a quiet area to one of the classrooms and a new staff room. This is a school for which we provided a new building incorporating 3 classrooms and stores several years ago. This project was to provide two additional smaller extensions. The first was of […]