Project Overview The Safeguarding Improvements Project at Selling Primary School involved a comprehensive programme of works designed to strengthen security and safeguarding across the school site. The works included a new secure perimeter, upgraded fencing and gates, controlled pedestrian and vehicle access, new access control and CCTV systems, improved external lighting, and associated landscaping and […]
This project involves the refurbishment and specialist fit-out of new Dental and Dietetics teaching facilities within an existing university campus building. The scheme will transform existing internal spaces into modern, purpose-designed teaching environments capable of supporting specialist healthcare education and practical training. The works comprise a comprehensive refurbishment programme, including enabling works and site establishment, internal soft […]
Fire Safety Upgrades – Completed Project Case Study P A Hollingworth successfully completed a comprehensive programme of fire safety upgrades across a number of residential properties located throughout the university campus. The project involved the installation of Q-Mark certified fire doors and comprehensive fire-stopping measures, addressing recommendations identified through fire risk assessments undertaken across the […]
During our time at the school undertaking the RAAC replacement works, we were subsequently appointed to undertake the fire safety upgrade works throughout the rest of the school. The fire safety upgrades at the school were essential for improving the overall fire protection and management systems. The school underwent a comprehensive fire safety audit of […]
P A Hollingworth was employed to undertake the successful execution of a comprehensive asbestos removal and fire safety upgrade project at a local school. The aim of the project was to ensure a safe learning environment for students and staff by addressing both health risks posed by asbestos and enhancing fire safety measures, including door […]
The existing concrete flat roof construction over classrooms and offices is failing. Water ingress is evident in several locations and props are in use where the structure has begun to collapse. The project includes the following; – Provision of replacement temporary classrooms, offices, WC’s and storage areas required for continued, uninterrupted school life. This work […]
This build was a replacement for the existing portable cabins used for both a community youth club and a day nursery. The new building was designed in a horseshoe shape to provide a safe exterior courtyard for the day nursery along with kitchen, classrooms and WCs all down one side of the building and central […]
To replace existing portacabin classrooms with a new building, providing three large classrooms, a toilet block and a link corridor to the main school. The finished classrooms were fully equipped with storage units, bookshelves and craft areas, including sinks. The construction was of a single storey building built over traditional foundations with ground bearing slab […]
P.A. Hollingworth was contracted to undertake the installation of a ‘secure line’ boundary to the school grounds. This included the installation of new security fencing, vehicular and pedestrian gates, access control systems and a site-wide CCTV system alongside associated sundry works. External Grounds – We formed the new secure site boundary using 2.0m high P100 […]
P A Hollingworth & Co Ltd were contracted to safely expand a Sure Start Children’s Centre in Thanet without closure, making maximum use of the outside courtyard and adding both a kitchen and DDA compliant WC. This was a 66m² courtyard, surrounded on 3 sides by existing single face brickwork walls to the existing building. As […]